Go to file
zio d8ef5c53df feat(m2): DWG/JPG floorplan underlay tabs + CAD extraction pipeline
Owner directives 2026-07-14~15: run the DWG pipeline; split floorplan into DWG and JPG tabs.

- tools/cad/dwg_extract.py: DWG(LibreDWG dwg2dxf) -> DXF -> layer inventory /
  keyword extraction / grid-label anchor detection (ezdxf, recover fallback)
- tools/cad/render_hall_png.py: render hall-band crops from the K1 combined
  plan+trench drawing (x0=293.5m, width 171m, Y bands 80.1m + 63m pitch,
  single load -> multi-crop). Real trench layout confirmed: 7 horizontal runs
  at ~9m pitch + central feeder (differs from assumed 6m grid seed - V61 later)
- public/media/floorplans/dwg/hall1..5.png: K1 hall underlays (3m margin crop,
  deterministic calibration from render params)
- Editor left panel new tool group with JPG/DWG tabs; DWG disabled for
  halls without CAD render yet (K2 pending). Canvas switches url+region.
- docs/analysis/cad-extraction.md: pipeline findings, limits (A3002 LibreDWG
  crash, band-to-hall numbering direction to confirm), next steps

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-15 00:35:12 +09:00
.claude docs(demo): AI demo procedure deck + fix graphify hook path separators 2026-07-14 00:50:46 +09:00
.vscode fix(schedule,ui): holidays on exhibition calendar, bilingual brand, neutral calendar borders 2026-07-12 19:16:48 +09:00
ci fix(schedule,ui): holidays on exhibition calendar, bilingual brand, neutral calendar borders 2026-07-12 19:16:48 +09:00
deploy deploy: persist self-hosted APK downloads across atomic webroot swaps 2026-07-13 06:41:34 +09:00
docs feat(m2): DWG/JPG floorplan underlay tabs + CAD extraction pipeline 2026-07-15 00:35:12 +09:00
mobile fix(mobile): declare roleCode on AuthUser so admin/manager land on tabs home, not visitor tickets 2026-07-13 05:16:35 +09:00
scripts fix(schedule,ui): holidays on exhibition calendar, bilingual brand, neutral calendar borders 2026-07-12 19:16:48 +09:00
src feat(m2): DWG/JPG floorplan underlay tabs + CAD extraction pipeline 2026-07-15 00:35:12 +09:00
stitch_kintex_ai_system_architect fix(schedule,ui): holidays on exhibition calendar, bilingual brand, neutral calendar borders 2026-07-12 19:16:48 +09:00
tools feat(m2): DWG/JPG floorplan underlay tabs + CAD extraction pipeline 2026-07-15 00:35:12 +09:00
.gitattributes fix(schedule,ui): holidays on exhibition calendar, bilingual brand, neutral calendar borders 2026-07-12 19:16:48 +09:00
.gitignore chore: gitignore graphify-out and screenshot generated outputs 2026-07-13 00:30:30 +09:00
CLAUDE.md 솔루션명 수정 2026-07-13 04:23:07 +09:00
harness_사내전용_설치가이드.pptx fix(schedule,ui): holidays on exhibition calendar, bilingual brand, neutral calendar borders 2026-07-12 19:16:48 +09:00
Jenkinsfile fix(schedule,ui): holidays on exhibition calendar, bilingual brand, neutral calendar borders 2026-07-12 19:16:48 +09:00
kintex-harness-v1.0.1.zip fix(schedule,ui): holidays on exhibition calendar, bilingual brand, neutral calendar borders 2026-07-12 19:16:48 +09:00
README.md fix(schedule,ui): holidays on exhibition calendar, bilingual brand, neutral calendar borders 2026-07-12 19:16:48 +09:00
행안부 표준운영절차_2.pdf fix(schedule,ui): holidays on exhibition calendar, bilingual brand, neutral calendar borders 2026-07-12 19:16:48 +09:00

KINTEX AI 시스템

킨텍스 전시 운영(부스 배치·인테리어 공사·네트워크 배선·전기·조명)을 AI로 자동화하고, 나노바나나(Gemini 이미지 생성)로 시공 후 결과 사진까지 미리 보여주는 시스템.

시작하기 (Claude Code / Cowork)

이 폴더를 Claude Code로 열면 CLAUDE.md와 .claude/agents/의 기획(planner)·디자인(designer)·개발(developer)·시각화(visualizer)·검증(reviewer) 에이전트가 자동 인식된다.

예시:

> 부스 배치 추천 기능의 기획을 보강해줘        # → planner 에이전트
> 배선 신청 화면 design.md에 추가해줘          # → designer 에이전트
> 3x3 목공부스 야간 시안 이미지 만들어줘        # → visualizer + nanobanana-visualize 스킬