Commit Graph

5 Commits

Author SHA1 Message Date
zio
b718310854 docs: PLANNING v3.4/design v2.4 updates, backlogs and owner feedback log
- PLANNING: home IA, AI token-min plan (§8A), data standard, SSO+HR
- design.md: COEX-style public visual/motion spec, Nifty design system
- IMPLEMENTATION_BACKLOG + UNDEVELOPED_BACKLOG waves
- OWNER_FEEDBACK: authoritative session directive log

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-24 00:40:56 +09:00
zio
d4bd4fb214 docs: PLANNING v3.5 (M2-1 easy auto-layout wizard) + design.md v2.6 (SCR-03/04 wizard, lightbox) + owner feedback log session 5
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-14 23:39:34 +09:00
zio
d548044f34 docs(design): design.md v2.5 — resolve designer backlog B-01, B-04~B-08, B-10
- B-01: SCR-06 assembled-booth mode (signage/furniture/lighting option panels,
  option quote, deadline lock states, dedicated Stitch prompt) + SCR-05 branch
- B-04: screen count re-audit — P0 core 15, total 89 screens (SCR-T0~T3 included)
- B-05: organizer sitemap gains 정산·결제 [M9] entry, SCR-02 IA memo
- B-06: SCR-01 prompt adds email-verification login tertiary button
- B-07: SCR-03 share button in prompt + violation pins aligned 1:1 with summary
- B-08: SCR-04 sales area corrected 4,420 -> 4,590㎡ (510 booths x 9㎡)
- B-10: Phase 2/3 labels on SCR-10/11, SCR-M1/M2; M4a lighting UI review memo

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-14 22:06:05 +09:00
zio
37aeebdd28 솔루션명 수정 2026-07-13 04:23:07 +09:00
GUARDiA
6294627070 fix(schedule,ui): holidays on exhibition calendar, bilingual brand, neutral calendar borders 2026-07-12 19:16:48 +09:00